MaineDOT Logo

MaineDOT 2026-2027-2028 Work Plan

From maintaining the existing system to improving safety and strengthening communities, MaineDOT’s 2026–2028 Work Plan details the work ahead. View the full plan and learn how we’re investing in Maine’s transportation future.

Home

Paving to Begin in Monmouth-Winthrop-Wayne

Monmouth ? Crews will be paving Route 202 and Route 133 in the towns of Monmouth, Winthrop and Wayne beginning on Monday, May 4th.

The first paving project will start .08 of a mile easterly of the Leeds/Monmouth town line and extend 6.73 miles to 0.2 of a mile westerly of the intersection of Route 202, Annabessacook Road and Old Lewiston Road in Winthrop.

The second half of the project begins on the Route 202 ramps and extends northwesterly on Route 133 for 6.47 miles to 0.4 of a mile north of Old Winthrop Road.

Overnight Paving Along Route 1 in Woolwich

Woolwich ? Crews have started a paving project along Route 1 in Woolwich from the Bath Bridge over the Kennebec River to the railroad overpass near the Taste of Maine restaurant as well as along the Arrowsic Road to the Max Wilder Bridge.

All work will be done from 7:00 p.m. to 6:00 a.m. No work will be performed from Friday at 6:00 a.m. until Sunday at 7:00 p.m. The project will be active until June 20th and then be suspended for the summer. A final layer of pavement will be applied in the fall, after the Labor Day holiday.

I-295 WRECKS BRUNSWICK

State Police say three cars and a tractor trailer have been involved a series of crashes on Interstate 295 in Brunswick a short time ago. One of the cars overturned.

Traffic southbound has been reduced to one lane, with traffic now backed up for over a mile.

The injuries involved are not life threatening , but traffic will be slowed in the southbound lane for most of the afternoon. Northbound traffic is not affected.

Paving Project to Begin in Smithfield-Norrwidgewok

Smithfield-Norridgewok ? Crews will be back this season paving, placing loam, installing curbing, paving sidewalks and grading driveways on Route 8 in Smithfield and Norridgewok beginning on Monday, May 11th.

The project will start at the intersection of Island Lane in Smithfield and extend 7.3 miles to Route 2 in Norridgewok. From Perkins Street, the project will begin at Route 8 and extend 0.53 of a mile to Route 2.

Paving to Begin in Smithfield

Smithfield ? Crews will be paving and installing new drainage as well as performing safety improvements in the towns of Smithfield, Farmington, New Sharon, Mercer and Norridgewock beginning on Monday, May 11th.

The project will start on Route 8 in Smithfield beginning 0.21 of a mile north of Rome Road and extend northerly for 1.79 miles to 1.18 miles north of Pine Tree Road.

On Route 2 the project begins 0.39 of a mile northeasterly of the Mercer-Norridgewock town line and extend 3.48 miles northeasterly.

Paving to Begin on Route 202 in Alfred, Lyman and Waterboro

Alfred ? Crews will be paving on Route 202 in Alfred, Lyman and Waterboro beginning on Monday, May 11th.

The paving project begins on Route 202 approximately 0.08 of a mile north of Oak Street, proceeding easterly for 7.34 miles to the junction of Route 5.

At times there will be alternating one-way traffic controlled by flaggers. Motorists should expect minor delays when traveling through the work zones.

Highway Reconstruction Project Resumes in Wallagrass/Eagle Lake

Wallagrass ? Crews will be performing a highway reconstruction project on Route 11 Aroostook County beginning on Monday, May 11th.

The project location is on Route 11 beginning 0.05 of a mile north of the Eagle Lake/Wallagrass town line and extends northerly for 3.12 miles.

Motorists will be guided through alternating one-way traffic through the work zones controlled by flaggers. Minor delays are expected.

The work includes road reconstruction, drainage and box culvert installations, guardrail replacements and other incidental work.

Paving to Begin in Naples

Naples ? Crews will be back this season paving an approximate ten mile stretch of road through the towns of Naples, Casco and Poland beginning on Monday, May 18th.

The paving project will begin at the intersection of Routes 302 and 11 in Naples. Traffic will be reduced to one lane assisted by flaggers. Motorists should expect slight delays through the work zones.

The project ends at the intersection of White Oak Hill Road and Route 11 in Poland.

It is anticipated all work will be completed by the end of June, 2015.

Paving to Start in Bingham

Bingham ? Crews will be paving on Route 201 in the Forks Plantation and in the town of Bingham starting on Monday, May 18th.

Crews will pave the first section on Route 201 beginning 1.26 miles northerly of the Caratunk town line and extend northerly for 4.95 miles.

In Bingham, the paving project will start on Route 201 beginning 0.17 of a mile northerly of Tanglewood Drive and extend northerly for 4.90 miles.

Motorists should expect slight delays with alternating one-way traffic controlled by flaggers.