MaineDOT Logo

MaineDOT 2026-2027-2028 Work Plan

From maintaining the existing system to improving safety and strengthening communities, MaineDOT’s 2026–2028 Work Plan details the work ahead. View the full plan and learn how we’re investing in Maine’s transportation future.

Home

Southbound Closure of I-95 in Pittsfield on Monday Night

PITTSFIELD - The Maine Department of Transportation will be closing the southbound side of I-95 near Mile Marker 152 in Pittsfield from 7:00 p.m. on Monday, January 6th until 5:00 a.m. on Tuesday, January 7th. This closure is necessary while crews repair pavement on the median crossover. This is part of the ongoing project to replace interstate bridge decks on the bridges that carry the interstate over the Sebasticook River and Route 152. The contractor on this project is Northeast Paving of Bangor. The construction contract amount is approximately $3.7 million.

Full Closure of Ticonic Bridge One Week Away

WATERVILLE/WINSLOW - Next Monday, January 6th, the Maine Department of Transportation will be closing the Ticonic Bridge to all traffic for approximately six months as part of the ongoing work to replace the bridge, which carries Route 201 over the Kennebec River between Waterville and Winslow. Both vehicles and pedestrians will be required to follow the posted detour routes. Vehicles will be detoured south to the Carter Memorial Bridge. Pedestrians will be detoured north to the Two Cent Bridge.

Full Closure of Ticonic Bridge Scheduled for January

WATERVILLE/WINSLOW - On January 6th, 2025, the Maine Department of Transportation will be closing the Ticonic Bridge to all traffic for approximately six months as part of the ongoing work to replace the bridge, which carries Route 201 over the Kennebec River between Waterville and Windslow. Both vehicles and pedestrians will be required to follow the posted detour routes. Vehicles will be detoured south to the Carter Memorial Bridge. Pedestrians will be detoured north to the Two Cent Bridge.

Bridge Replacement Work in Albion

ALBION - The Maine Department of Transportation is replacing the Puddle Dock Bridge in Albion. The bridge carries traffic over Fifteenmile Stream on South Freedom Road. The current structure was installed in 1933 and is past its useful life. The new bridge will be 104-feet-long and have 11-foot-wide travel lanes with three-foot-wide shoulders. Work began this month and is anticipated to be completed in November. The road will be closed until all work has been completed. Signs direct drivers to a detour route. The contractor on this project is CPM Constructors of Freeport.

Songo Lock Draw Bridge Operating Delayed

NAPLES - Due to high water levels and trees blocking the Songo River, the Maine Department of Transportation will not be able to open the Songo Lock Draw Bridge in Naples until Saturday, May 11th. MaineDOT typically begins operating the draw bridge on May 1st to allow the passage of marine traffic under State Park Road. The department is communicating with other state agencies as we all work toward the new date when the seasonal bridge operation can begin.

Weekend Bridge Closure on Route 16 in Franklin County

COPLIN PLANTATION - The Maine Department of Transportation will be temporarily closing the Nash Bridge on Route 16 in Coplin Plantation on Saturday, April 27th. This full closure is scheduled to run from 7:00 a.m. until 4:00 p.m. This closure is required to allow repair work on the bridge approach slabs, which were damaged in the December 18th storm. The vehicle detour involves using Routes 27, 142, and 4. The contractor on this project is Jordan Excavation of Kingfield. The contract amount is $350,000.

Frank J. Wood Bridge Inspection Next Week

BRUNSWICK/TOPSHAM - The Maine Department of Transportation will be performing a bridge inspection of the Frank J. Wood Bridge on Wednesday, April 24th. This bridge carries Route 201 between Brunswick and Topsham. Because of the poor condition of the fracture critical Frank J. Wood Bridge, MaineDOT engineers inspect it every six months instead of the normal every 24-month frequency. Construction of a new bridge is currently underway.

Bailey Island Bridge Repairs

HARPSWELL - The Maine Department of Transportation will be making repairs to the Bailey Island Bridge on Route 24 in Harpswell between Orrs Island and Bailey Island. Most of the work involves resetting granite stones that shifted during coastal storms in January. Other work includes drainage repairs and debris removal. Route 24 will be reduced to a single lane of traffic at times. Drivers may encounter full road closures that last no longer than 15 minutes. The sidewalk on the bridge may be closed to pedestrians at times during construction.

Subscribe to