MaineDOT Logo

Archived Bid Opportunities

Bid Date WIN(s) Municipality Summary Status Date posted
PH20230510BGM Regions 2 & 4

On Call Building & Grounds Maintenance and Repair Services at Multimodal Facilities and Moveable Bridge Piers.

Awarded
026021.00 Hollis

Traffic Signal at Route 202/Route 35 in Hollis:
Project is located at Route 202/Route 35 in the town of Hollis.

Awarded
023759.10, 024197.10 South Thomaston / Saint George / Jefferson

Placement of Plant Mixed Recycled Asphalt Pavement & HMA Overlay:

  • 023759.10 begins in South Thomaston on Route 73, 0.03 of a mile south of Island Road and extending west 3.43 miles.
  • 024197.10 is located in Jefferson on Route 126, beginning at Gardiner Road and extending northeast 0.45 of a mile.
Opened
021663.00, 022276.01 Bangor

Interstate 95/Broadway Bridge Replacement and Broadway Street safety improvements:
Located approximately 1.7 miles westerly of Exit 187.
 

Awarded
029233.00 Greene - Region 2

Large Culvert Replacement:
Project is located on Route 202 in Greene at the intersection of Sprague Mills Road.

Awarded
026998.00 Houlton

Pavement Milling, HMA Overlay with Drainage & Safety Improvements:
Project is located on US Route 1 in Houlton, beginning at US Route 2 and extending North 1.90 miles. Includes 0.34 of a mile on US Route 1 South.

Opened
025427.00 Farmington

Culvert Slip Line:
Project is located on Route 2 in Farmington.

Awarded
025391.00 Auburn

Large Culvert Rehabilitation:

Project is located on Route 202, approximately 0.19 mile north of Eastman Lane.
 

Awarded
025125.00 Auburn

Pavement Milling, HMA Overlay with Drainage & Safety Improvements.

Project is located on:

  • US Route 202 in Auburn, beginning 0.07 miles North of Little Androscoggin River Bridge and extending North 2.52 miles to 0.05 miles South of Elm Street. 
  • US Route 202S, beginning 0.02 miles South of High Street and extending South 2.72 miles to 0.05 miles South of Chasse Street on ramp.

Includes crossovers and ramps. 

Opened
026486.00 / 026630.05 Columbia /Jonesboro, Machias / East Machias

Pavement Milling, HMA Overlay, Cold In-Place Recycle with Drainage and Safety Improvements:

  • 026486.00 is located on Route 1, beginning 0.11 of a mile from Addison Road and extending east 9.84 miles. 
  • 026630.05 is located Route 1, beginning 0.03 of a mile east of the Whitneyville town line and extending north 6.59 miles.
Awarded
PH20230503VGMT Regions 1-2-3-5

Vegetation Management Services.

Awarded to:

  • Aroostook Arboriculture Inc of Presque Isle, ME-Region 1, 2, 5
  • Donald Dubois dba Dubois Contracting of Fort Kent, ME-Region 3.
Awarded
025525.00 Houlton / Ludlow / New Limerick / Oakfield / Smyrna

Pavement Milling, HMA Overlay, Ultra-Thin Bonded Wearing Course with Drainage and Safety Improvements:
Project is located on Interstate 95 Southbound, beginning at the Canadian/US Border Customs Crossing in Houlton and extending 19.27 miles South to the Oakfield/Dyer Brook town line.
 

Opened
025377.00 Brewer

Pavement Milling, HMA Overlay with Drainage & Safety Improvements:

Project is located on Route 15 (South Main Street) in Brewer, beginning at Abbott Street and extending North 0.97 of a mile to Wilson Street. 

Awarded
025395.00 Topsham

Large Culvert Rehabilitation:
Project is located on Interstate 295 Northbound, approximately 1.26 miles north of the Exit 31 on-ramp. 

Awarded
LAP025379.00 Bangor - (LAP)

Oak Street Resurfacing Project:

Located along a portion of Oak Street, starting at State Street and extending southerly 0.23 miles to Washington Street, Bangor, Maine.

Opened
PH20230503ROL Statewide

On Call Rollers and RC Trench Rollers - Equipment Rental without an Operator.

Awarded to:

  • Houlton Rental Center, Inc. of Houlton, ME-Region 5.
  • Eagle Rental of Waterville, ME-Regions 1,2,3,4,5.
  • Shaw Brothers Construction of Gorham, ME-Regions 1,2,3.
  • United Rentals (North America), Inc. of Oakland, ME-Regions 1,2,3,4,5.
Awarded
025997.00 Windham

Pavement Milling, HMA Overlay with Drainage and Safety Improvements:

Project is located on US Route 302 in Windham, beginning at US Route 202 and extending North 2.82 miles to River Road.

Awarded
PH20230419MOW Regions 2, 4, & 5

Controlled Access Highway and Interstate Mowing, including Litter Removal.

Awarded to:

  • Roy Services Inc. of Limestone, ME, on May 15, 2023: Region 2-Section 2; Region 4-All Region Sections.
  • Awarded to Jackett Enterprises of Houlton, ME, on June 13, 2023:  Region 5-Litter Removal Only.
Awarded
027304.00 Limerick

Large Culvert Replacement:
Project is located on Route 11 in Limerick, at the intersection of Dog Road.

Awarded
021840.00 Westfield

Living Snow Fence & Safety Improvements:
Project is located on U.S. Route 1, beginning 0.05 miles south of Cambridge Road and extending north approximately 0.30 miles.

Rejected
025385.00 Gray

Drainage Improvements:

Located at the intersection of U.S Route 202, with Route 115, and Route 26. 

Rejected
026908.00 Westport / Wiscasset

Bridge Paint Project:
In Lincoln County, Westport - Wiscasset bridge over Cowsweag Narrows on the Main Road/State Route 144 town line.

Awarded
026452.00 Portland

Fore River Parkway and Congress & Park Street Bridge Paint projects, in Cumberland County:

  • Interstate 295 Northbound (Bridge No. 6292) and Southbound (Bridge No. 6556) over Fore River Parkway, approximately 0.6 of a mile north of South Portland city line. 
  • Interstate 295 Northbound (Bridge No. 6294) and Southbound (Bridge No. 6535) over Congress & Park Streets, approximately 0.75 of a mile north of South Portland city line.
Awarded
022256.00 Webster Plantation

Mattagodus Bridge Replacement in Penobscot County:

Located on Park Street/State Route 170 over Mattagodus Stream, approximately 0.43 of a mile southeasterly of the Kingman Township line.
 

Awarded
PH20230419MOW Regions 2, 4 & 5

Controlled Access Highway and Interstate Mowing Including Litter Removal in Regions 2, 4 & 5.

 

Awarded to Roy Services Inc. of Limestone, ME; Region 2, Section 2; Region 4, All Region Sections

Awarded to Jackett Enterprises of Houlton, ME; Region 5 Litter Removal Only.

Awarded
Ashland, Portage Lake & Nashville Plantation - Region 5 Ashland / Portage Lake / Nashville PLT.

Pavement Milling, HMA Overlay with Drainage & Safety Improvements:

  • 024690.00 is located on Route 163 in Ashland, beginning at Route 11 and extending East 0.59 of a mile.
  • 026626.10 is located on Route 11, beginning in Ashland at Route 163 and extending North 16.24 miles to Portage Lake.
Awarded
025127.00 Livermore Falls

Hot Mix Asphalt Overlay with Drainage and Safety Improvements in the Town of Livermore Falls:

Project is located on Route 133 in Livermore Falls, beginning at the Wayne town line and extending North 6.97 miles.

Awarded
025287.00 Norway / Oxford

Pavement Milling, HMA Overlay with Drainage & Safety Improvements:

Located on Route 26, beginning in Oxford 0.02 miles South of Fore Street on Oxford and extending northwest 3.58 miles to 0.05 miles south of Winter Street in Norway.

Awarded
026176.00, 026446.00, 026448.00 Portland

Tukey and Franklin Street Bridge Paint Projects, in Cumberland County:

  • Tukey Bridge on Interstate 295, over Back Bay, approximately 1.6 miles southerly of Falmouth town line. 
  • Franklin Street Bridges on Interstate 295, over Northbound and Southbound, approximately 0.25 of a mile south of Route 1A Exit.
Awarded
022972.00, 025419.10, 026806.00 Saint Francis / Fort Kent / Saint John PLT.

Placement of Recycled Plant Mix Asphalt Pavement, Cyclical Pavement Resurfacing & HMA Overlay with Safety Improvements:

  • 022792.00 is located on Route 161, beginning 0.57 of a mile East of Mill Road and extending Easterly 0.11 of a mile.
  • 025419.10 is located on Route 161:
  1. Segment 1 begins 0.58 of a mile East of the St. Francis/St. John PLT line and extends east 0.24 of a mile. 
  2. Segment 2 begins 2.33 miles East of the St. Francis/St John PLT line and extends East 3.40 miles. 
  3. Segment 3 begins 0.09 of a mile West of Violette Settlement Road and extends East 1.42 miles.
  • 026806.00 is located on Route 161:
  1. Segment 1 begins 0.25 of a mile West of Sankey Strip Road and extends East 1.41 miles. 
  2. Segment 2 begins 0.89 miles West of Bea Road and extends East 1.31 miles. 
  3. Segment 3 begins 1.21 miles West of the Fort Kent line and extends East 4.61 miles.
Awarded