MaineDOT Logo

Archived Bid Opportunities

Bid Date WIN(s) Municipality Summary Status Date posted
024483.00 Standish / Limington / Cornish / Parsonsfield

Pavement Milling, Ultra-Thin Bonded Wearing Course, with Safety Improvements:

Project is on Route 25:

  • Section 1 beginning in Standish 0.07 of a mile west of Route 35 and extending west 2.08 miles,
  • Section 2 beginning in Limington 0.03 of a mile west of the Standish town line and extending west 9.13 miles, 
  • Section 3 beginning in Cornish at Sokokis Trail and extending west 4.06 miles.
Awarded
024461.00 Farmington

Pavement Milling, Ultra-Thin Bonded Wearing Course with Safety Improvements:

Project is located on Route 4 in Farmington beginning at Anson Street and extending northwest 2.18 miles.

Awarded
022330.00, 023523.00 Long Pond / Monson - Region 3

Bridge Paint Projects:

  • Parlin Stream Number Two Bridge is located on Long Pond Road/Route 6, 15 approximately 3.0 miles westerly of Sandwich Academy Grant township line.
  • Barrows Falls Bridge is located on Barrows Falls Road over the Piscataquis River approximately 1.0 mile northerly of Abbot town line.
Awarded
026263.00 The Forks Plantation

Culvert Slipline: 

Located on Route 201.

Awarded
PH023871.20P123 Regions 1, 2, & 3

Pavement Marking & Stenciling.

Awarded
024453.00 Northport / Searsport / Belfast

Pavement Milling, Ultra-Thin Bonded Wearing Course with Safety Improvements:

Located on US Route 1, beginning in Northport 0.01 of a mile south of the Northport town line and extending north 3.76 miles, including the four ramps, then beginning 0.13 of a mile west of Route 141 and extending east 4.57 miles, including Veteran's Memorial Bridge (#5750).

Awarded
023933.10, 024471.00, 024473.00, 026431.00 Farmingdale / West Gardiner / Winthrop / Gardiner

Pavement Milling, Ultra-Thin Bonded Wearing Course, Hot Mix Asphalt Overlay with Drainage and Safety Improvements:

  • 023933.10 is on US Route 202 in Winthrop beginning 0.03 of a mile south of Annabessacook Road and extending north 1.44 miles.
  • 024471.00 is on US Route 201 in Farmingdale beginning 0.03 of a mile north of the Gardiner town line and extending north 1.55 miles.
  • 024473.00 is on Route 9 beginning in West Gardiner 0.07 miles east of Service Plaza Drive and extending 3.16 miles east.
  • 026431.00 is on Winter Street in Gardiner beginning at the intersection of Summer Street and extending south 0.06 of a mile including Bridge #5070.

 

Awarded
022496.10, 022496.55 Township of Cross Lake / Town of St. Agatha

Placement of Plant-Mixed Recycled Asphalt Pavement, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements:

022496.10 & 022496.55 are located, beginning 0.03 miles North of the intersection of Route 161 & Route 162 extending Northeasterly 10.47 miles. 

Awarded
023905.00 Holden

Traffic Signal Modifications:

Located at the Intersection of US Route 1A with Route 46.

Awarded
022416.00 Cape Elizabeth

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements:

Project is located on Scott Dyer Road, beginning at Spurwink Avenue and extending east 0.89 miles to Ocean House Road.

Awarded
PH023871.20P4 Region 4

Pavement Marking & Stenciling.

Awarded
023617.40, 023681.00 Howland / Edinburg / Townships of Alton / Argyle / Mattamiscontis / T2R8 NWP / T2R9 NWP / Old Town

Pavement Milling, Ultra-Thin Bonded Wearing Course, Hot Mix Asphalt Overlay, Bridge Work and Safety Improvements:

  • 023617.40 is located on Interstate 95 for bridge joint work on Interstate 95 southbound: Bridges #1424, #1425, #6063, #6069, #6070, #6071, #6072, #6073, and #6075.
  • 023681.00 is located on Interstate 95 beginning at the Medway/T2R9 NWP town line and extending 47.41 miles to the Kirkland Bridge in Old Town.
Awarded
023543.00, 023775.00, 024099.10 China / Vassalboro / Winslow / Waterville

Pavement Milling, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements:

  • 023453.00 is on US Route 201 beginning in China at US Route 202 and extending west 6.14 miles to Route 137B, then extending north 1.04 miles to US Route 201.
  • 023775.00 is on US Route 201 in Vassalboro beginning 0.55 of a mile north of Webber Pond Road extending north 0.06 of a mile.
  • 024099.10 is on Route 104 in Waterville beginning at Dunbar Court and extending north 0.42 of a mile.
Awarded
026269.00 Greene

Ditching and Driveway Pipe Replacements:

  • Located on Sawyer Road.
Awarded
PH20200318MVE Rockland / Lincolnville /Tremont (Bass Harbor)

Maintenance and Repair of Marine Vessel Electronics.

Awarded
026265.00 Chelsea / Whitefield

Forestry and Canopy Clearing:

  • Located on Cooper Road in Chelsea and Whitefield.
Awarded
PH20200318RAM Mopang Stream / T30 MD BPP / Crawford / Calais / Robbinston / Perry / Sullivan / Hancock

8 Seasonal Rest Areas:

Maintenance, Cleaning and Light Carpentry.

Awarded
024413.00 Raymond

Pavement Rehabilitation

Located off the Raymond Cape Road at the Ferry Service Entrance Road.

Awarded
023246.00 Waterville

Highway Reconstruction:

Project is located on the Trafton Road beginning 0.05-mile westerly of the I-95 SB ramp extending 1.30 miles easterly to the Route 104 intersection.

Awarded
021162.20S, 021162.21S, 021162.22S, 021162.23S Region 5

Skid Steer Loader.

Awarded
PH20200311ATH Statewide

On-Call Athey

 Equipment Rental with an Operator.

Awarded on May 7, 2020, to the following:  

  • E. C. Barry & Son of Farmingdale, ME-Regions 1, 2, 3 & 4; 
  • M.O. Harris, Inc. of Howland, ME-Regions 1, 2, 3, 4 & 5.
Awarded
018995.23 Montville / Searsmont / Morrill / Belmont / Vassalboro / Windsor / China / Augusta

Crack Sealing

Located in Kennebec and Waldo Counties

  • Priority 1 is located on Route 3 beginning 0.19 miles west of North Ridge Road in Montville and extending easterly 7.30 miles to Belmont
  • Priority 2 is located on US Route 201 beginning from Route 3 in Augusta and extending north 8.30 miles to Vassalboro/
  • Priority 3 is located on Route 32 beginning at Route 17 in Windsor and extending north 8.60 miles to Route 3 in China.
Awarded
022014.00 Peaks Island

Transfer Bridge Repairs:

Located at Peaks Island Ferry Terminal.

Awarded
022974.00 Sanford

Highway Safety Improvements

Project is located at the intersection of Route 109/4A/4.

Awarded
022496.55L, 023695.55L, 026443.00L Regions 1, 4 & 5

Loaders:

  • 023695.55L loader may be located at MaineDOT property at 40 Snow Road in Durham,
  • 026443.00L loader may be located at the MaineDOT Maintenance Lot at 2510 Moosehead Trail in Plymouth,
  • 022496.55L loader may be located at MaineDOT property on Route 161 on Caribou.
Awarded
PH20200311EAD Statewide

On Call Excavators & Dozers

Equipment Rental with an Operator.

 

Awarded on April 29, 2020, to the following:  

  • F. C. Work & Sons of Jackson, ME-Regions 2&4; 
  • Soderberg Company of Caribou, ME-Region 5 Areas 1,2,3; 
  • Wayne L. Spear and Son of East Machias, ME-Region 4; 
  • Shaw Brothers Constr., Inc. of Gorham, ME-Region 1&2;  
  • Fanado Pelotte Contractor of Waterville, ME-Region 2; 
  • Ed Pelletier and Sons Co. of Madawaska, ME-Region 5 Areas 1&2;  
  • J.R. Nunes & Sons Excavation, Inc. of Lexington Twp., ME-Regions 3&4;
  • Nathan O. Northrup Forest Products & Earthwork of Jefferson, ME-Regions 1, 2, 3, 4 & 5;  
  • M.J. Ouellette & Daughters, Inc. of Caribou-Region 5 Areas 1&2;  
  • McGillan, Inc. of Brunswick, ME-Region 5 Areas 1&2; 
  • Ray Labbe & Sons of Brunswick, ME-Region 1&2; 
  • Carl D. Knowles dba Knowles & Sons Excavation of Manchester, ME-Regions 1,2,3 & 4;  
  • Hanscom Construction, Inc. of Marshfield, ME-Region 4; 
  • Hagar Enterprises, Inc. of Damariscotta, ME-Region 2; 
  • Dearborn Brothers Construction, Inc. of Buxton, ME-Region 1; 
  • Stanley W. Bemis of Harmony, ME-Region 3; 
  • Card Excavation & Tractor Work of Bowdoin, ME-Region 1&2; 
  • Brown Construction, Inc. of Houlton, ME-Region 5 Areas 2&3; 
  • Jake Barbour, Inc. of Rockland, ME-Region 2; 
  • Absolut Services, Inc. of Stratton, ME-Region 3.
Awarded
024477.00, 024479.00 Topsham / Lisbon / Lewiston

Pavement Milling, Ultra-Thin Bonded Wearing Course, with Drainage and Safety Improvements:

  • 024477.00 is located on Route 196 beginning 0.18 miles east of Birch Ridge Avenue in Topsham and extending northwesterly 5.48 miles to the intersection with Route 125 (Main Street) in Lisbon
  • 024479.00 is located on Route 196 beginning 9.17 miles west of Ridge Road in Lisbon and extending northwesterly 7.09 miles to 0.1. miles east of Drew Street in Lewiston.
     
Awarded
023553.00 Dexter / Sangerville

Pavement Milling, Cold In-Place Recycling, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements

Project is located on Route 23 beginning 0.33 mile north of Fellows Road in Dexter and extending northerly 4.76 miles to 0.51 mile north of Turner Road in Sangerville.

Awarded
020581.20A, 020581.21A, 020581.20B, 020581.21B Regions 2 & 4

Forklifts without an Operator:

Statewide but primarily Region 2 and Region 4 facilities.

Region 2 - 02581.20A & 02581.21A:

  • Awarded to Eagle Rental of Waterville, Maine on April 23, 2020;

Region 4 - 02581.20B & 02581.21B:

  • Awarded to United Rentals (North America) Inc. of Stamford, Connecticut on May 11, 2020.
Awarded
PH20200311SWP Statewide

On-Call Sweepers

Equipment Rental without an Operator.

Awarded