MaineDOT Logo

MaineDOT 2026-2027-2028 Work Plan

From maintaining the existing system to improving safety and strengthening communities, MaineDOT’s 2026–2028 Work Plan details the work ahead. View the full plan and learn how we’re investing in Maine’s transportation future.

HomeNews → Frank J. Wood Bridge Safety Inspection

Frank J. Wood Bridge Safety Inspection

Brunswick/Topsham ? A safety inspection on the Frank J. Wood Bridge connecting Brunswick and Topsham is scheduled for Monday, August 20th starting at 8 a.m.

During this one day event, northbound motorists on Route 201 and Route 24 will be detoured to Route 1 east to Route 196. Southbound traffic WILL be allowed on the bridge. Traffic will be re-opened to both lanes when crews have completed the inspection.

This routine inspection of the Frank J. Wood Bridge, spanning the Androscoggin River, is part of a bi-annual bridge safety inspection on truss-style bridges throughout the state. Additionally, crews will take advantage of this lane closure to perform a minor repair.