The project includes the design and construction of three bridge replacements and three bridge rehabilitations along the I-395 corridor between Bangor and Brewer, beginning near Exit 3 and ending near the Green Point Road Bridge. The six bridges include I-395 over Main Street in Bangor, Veterans Remembrance Bridge over the Penobscot River, I-395 over MCRR in Brewer, Robertson Blvd over I-395 in Brewer, Parkway South over I-395 in Brewer, and Green Point Road over I-395 in Brewer.
Project Documents
RFSO Files
Revised Bangor-Brewer I-395 Bridges RFSOI (PDF)
(Revised Construction Completion Date June 30, 2032)
Appendix A - Proposers General Information Form (PDF)
Appendix E - Civil Rights Supplemental and EEO Fillable Form (PDF)
Draft RFP Files
Request for Proposal Book 1 - Design Build Low Bid General Conditions DRAFT (PDF)
Request for Proposal Book 2 - Project Requirements DRAFT (PDF)
Bangor-Brewer I-395 Responses to Draft RFP Questions (PDF)
Final RFP
Request for Proposal Book 1 - Design Builder Low Bid General Conditions FINAL (PDF)
Request for Proposal Book 2 - Project Requirements FINAL (PDF)
Appendix A - Federal Wage Rates
Appendix B - Contract Forms and Exhibits
Contract Forms and Exhibits (zip)
Appendix D - Existing Plans and Inspection Documents
Existing Plans and Inspection Documents Part 1 (zip)
Existing Plans and Inspection Documents Part 2 (zip)
Existing Plans and Inspection Documents Part 3 (zip)
Existing Plans and Inspection Documents Part 4 (zip)
Existing Plans and Inspection Documents Part 5 (zip)
Existing Plans and Inspection Documents Part 6 (zip)
Existing Plans and Inspection Documents Part 7 (zip)
Existing Plans and Inspection Documents Part 8 (zip)
Existing Plans and Inspection Documents Part 9 (zip)
Existing Plans and Inspection Documents Part 10 (zip)
Existing Plans and Inspection Documents Part 11 (zip)
Existing Plans and Inspection Documents Part 12 (zip)
Existing Plans and Inspection Documents Part 13 (zip)
Existing Plans and Inspection Documents Part 14 (zip)
Existing Plans and Inspection Documents Part 15 (zip)
Existing Plans and Inspection Documents Part 16 (zip)
Existing Plans and Inspection Documents Part 17 (zip)
Existing Plans and Inspection Documents Part 18 (zip)
Existing Plans and Inspection Documents Part 19 (zip)
Existing Plans and Inspection Documents Part 20 (zip)
Appendix E - Geotechnical Data
Geotechnical Data Part 1 (zip)
Geotechnical Data Part 2 (zip)
Geotechnical Data Part 3 (zip)
Appendix F - Traffic and Accident Data
Traffic and Accident Data (zip)
Appendix G - Survey Data, Wetlands Delineation, and Existing Alignments
Survey Data, Wetlands Delineation and Existing Alignments (zip)
Appendix H - Permits and other Environmental Information
Permits and other Environmental Information (zip)
Appendix I - Supplemental Specifications and Special Provisions
Supplemental Specifications and Special Provisions - August 17, 2026 (zip)
Appendix J - Utilities
Current Schedule
| Date | Event |
|---|---|
| 3/04/2026 | MaineDOT Issues RFSOI |
| 3/18/26 at 3:00 PM EST | Deadline for Design-Builders to Submit Questions on RFSOI |
| 4/01/2026 | MaineDOT Issues Responses to Questions Received on the RFSOI |
| 4/14/2026 at 3:00 PM EDT | Deadline for Design-Builders to Submit SOI |
| 4/22/2026 | MaineDOT Issues Notification of SOI Responsiveness to Design-Builders |
| 4/29/2026 | Deadline for Design-Builders to Submit Cure for SOI Responsiveness (If Applicable) |
| 5/13/2026 | MaineDOT Evaluates and Ranks SOIs and Notifies Design-Builders of Selection Results |
| 6/03/2026 | MaineDOT Issues Draft RFP |
| 7/02/2026 at 3:00 PM EDT | Deadline for Design-Builders to submit Questions on the Draft RFP |
| 7/17/2026 | MaineDOT Issues Responses to Draft RFP Questions |
| 8/17/2026 | MaineDOT Issues Final RFP |
| One meeting per team between 9/21 and 9/30/2026. | Design-Builders Attend One-On-One Meetings with MaineDOT (If applicable) |
| 10/21/2026 at 3:00 PM EDT | Deadline for Design-Builders to Submit ATC Proposals |
| 11/17/2026 | MaineDOT Issues Responses to ATC Proposals |
| 12/09/2026 at 3:00 PM EDT | Deadline for Design-Builders to Submit Questions Final RFP |
| 12/30/2026 | MaineDOT Issues Responses to Final RFP Questions |
| 1/29/2027at 3:00 PM EDT | Deadline for Design-Builders to Submit Technical Packages |
| 2/17/2027 | MaineDOT Issues Notification of Technical Proposal Responsiveness to Design-Builders |
| 2/26/2027 | Deadline for Design-Builders to Submit Cure for Technical Responsiveness (If Applicable) and Price Proposal |
| 3/17/2027 at 11:00 AM EDT | Deadline for Design-Builders to Submit Proposal Guaranty Package |
| 3/17/2027 at 11:00 AM EDT | MaineDOT Opens Price Proposals |
| Spring 2027 | MaineDOT Awards Contract |
| Spring 2027 | Design-Builder Begins Final Design & Construction |
| 6/30/2032 | Design-Builder Completes Final Design & Construction |